15 Tonne

  • Pole Replacement up to 14/8 cca and concrete poles
    (this machine has been fitted with extra counter weight and dozer blade for extra stability and safety in the erection of poles, as well as crane valves for lifting, due to the Australian Standards Regulations)
  • Used regularly by the Power Industry in rough/steep terrain and wet conditions
  • Vehicle Recovery
  • Upgrade of transformers in rough/steep terrain
  • Boring
  • Site access
  • General Earth works
  • Rock drilling